How we work

Six stages, one architect,from first meetingto permit.

A café, a medical suite and a hillside home run through the same sequence. Here is what happens at each stage, what you receive, and what we need from you, so there are no surprises between the first conversation and the issued permit.

Consultation · Feasibility · Design · Documents · Permitting · Construction

Alfred Coffee · Sawtelle
The sequence

What a project looks like, start to finish.

Six stages, in the order they happen. Every one closes with something concrete: a written answer, a set of drawings, an issued permit.

Sheida Moradi, principal architect
01

Consultation

A conversation about the property or the lease, what you want to do with it, and what you can spend. You leave knowing what is realistic and which approvals the project is likely to trigger.

What happens

  • Walk through your goals, timeline and budget
  • Review the site, the lease or the survey
  • Identify the approvals the project will need
  • Agree the scope of services

What you receive

A clear picture of what is possible, followed by a written proposal setting out scope and fee.

What we need from you

Your goals, any lease or property documents, photos of the space, and the budget range you are working to.

02

Feasibility & code review

Before any design, we check what the zoning, the occupancy and the building code allow. For a change of use this is where exits, restrooms, parking and accessibility are confirmed; for a home, setbacks, height and hillside rules.

What happens

  • Zoning and occupancy analysis
  • Accessibility and health-code triggers
  • Parking, setbacks, height and design-review requirements
  • Existing-conditions survey where needed

What you receive

A feasibility summary: what the site allows, what the code requires, and the scope the design must satisfy.

What we need from you

Access to the space for measuring, and any existing drawings or permits you hold.

Architectural site plan showing zoning setbacks and parking
03

Design

Space planning first, then materials, lighting and detail. For a café that means the queue, the bar and the kitchen line; for a house, how the rooms and the light work together. You see the design in plans and 3D views before anything is fixed.

What happens

  • Schematic layouts and options
  • 3D views of the key spaces
  • Materials, finishes and lighting
  • Design development with your feedback

What you receive

A resolved design you have approved, ready to be documented.

What we need from you

Decisions. Timely feedback at each review keeps the schedule moving.

04

Construction documents

The drawings the contractor prices and the city reviews. We coordinate structural, mechanical, electrical, plumbing and kitchen consultants so the set is complete and consistent, which is what keeps plan-check corrections short.

What happens

  • Architectural plans, elevations, sections and details
  • Consultant coordination: structural, MEP, kitchen
  • Accessibility, energy and code compliance sheets
  • Specifications and schedules

What you receive

A permit-ready set of construction documents.

What we need from you

Sign-off on the design and any selections you are making yourself, such as equipment or fixtures.

Construction document floor plan
05

Permitting

We submit the set and answer the city. Depending on the project that means LADBS or the local building department, City Planning, and the County Health Department for restaurants and cafés. Corrections come back to us, not to you.

What happens

  • Submittal to Building, Planning and Health as required
  • Responses to plan-check corrections
  • Coordination with expediters and consultants
  • Follow-through to permit issuance

What you receive

An issued building permit, and the Health Department approval where the project needs one.

What we need from you

Owner signatures and city fees when they fall due.

06

Construction support

The permit is not the finish line. We stay involved while the space is built: answering the contractor, reviewing shop drawings and submittals, and visiting the site so what gets built matches what was drawn and approved.

What happens

  • Contractor questions and clarifications
  • Submittal and shop-drawing review
  • Site visits at key milestones
  • Support through final inspection

What you receive

A finished space that matches the drawings and closes out its permit.

What we need from you

A contractor engaged, and a point of contact on site.

Who does what

Three parties, one accountable architect.

Most delays in a project happen in the hand‑offs. Knowing where each one sits makes the schedule easier to read.

You

  • Set the goals and the budget
  • Make decisions at each design review
  • Sign submittals and pay city fees
  • Engage the contractor
Accountable

Sheida Moradi Architects

  • Feasibility, code and design
  • Complete, coordinated drawings
  • Submittals and every correction response
  • Site support through inspection

The city

  • Planning clearances
  • Building plan check and permit
  • Health Department review for food service
  • Inspections during construction
Questions

Before the first meeting

Timelines and fees depend on the project, so we give you specifics at the consultation rather than a number here.

Anything that describes the property or space and what you want from it: the lease or deed, a survey or existing drawings if you have them, photos, inspiration images, and a budget range. If you do not have these yet, come anyway; the consultation helps you assemble them.

As involved as you want to be. You make the decisions at each design review; we bring options and recommendations. Most clients meet at the end of each stage and otherwise stay in touch by email and phone.

It depends on the size and complexity of the project, the permits it triggers, and how quickly decisions are made. A small tenant improvement moves faster than a ground-up home. We give you an anticipated timeline at the consultation based on your project.

By the scope, size and complexity of the project and the services you need. After the consultation you receive a written proposal with the scope and the fee, so there are no surprises.

Yes. Preparing the submittal, filing it and answering plan-check corrections until the permit is issued is part of the service.

Yes. We answer contractor questions, review submittals and visit the site as needed so the building matches the drawings and the permit.

Schedule a consultation

Tell us about the space. We'll tell you what it takes.

A first conversation covers feasibility, the approvals your project will trigger, and a realistic timeline. No obligation.

  1. 01We reply within one business day to set up a call or a site visit.
  2. 02The consultation covers goals, budget, timeline and the approvals your project will trigger.
  3. 03You receive a written scope and fee proposal.

Consultation request

This field is for validation purposes and should be left unchanged.
Name(Required)
Drop files here or
Accepted file types: jpg, jpeg, png, pdf, Max. file size: 10 MB, Max. files: 5.