Permitting·3 min read

Retail to restaurant: what a change of use actually changes

A café in a former shop is one of the most common projects in Los Angeles, and one of the most misunderstood. Here is what changes when a building's use changes, and how to plan for it before you sign.

Draft for technical review. Timelines, fees and code specifics are stated generally on purpose. Sheida reviews and confirms every claim before this article is published.

“Change of use” sounds like paperwork. In practice it is the moment a building is asked to do a different job than it was approved for, and the code responds by asking for the things that job needs. A shop and a café have different fire risks, different crowds and different plumbing, so the building department checks that the space can support the new use before it issues a permit.

Occupancy: the classification behind the label

Every space has an occupancy classification under the building code. Retail is one group; restaurants and cafés with seating typically fall under an assembly group; small take-away counters may be treated differently. When the classification changes, the code requirements that apply to the space change with it. That is the whole mechanism of a change of use, and it is why two spaces of the same size can face very different scopes.

What the new use usually asks for

Exits

Assembly uses can require more or wider exits than retail, depending on how many people the space is designed to hold. Occupant load is calculated from the floor area and the layout, which is why the seating plan matters to the permit and not just to the business.

Restrooms

The number of fixtures required depends on the use and the occupant load. A shop that got by with one restroom may need more, and they must be accessible.

Accessibility

A change of use triggers accessibility upgrades: an accessible path of travel from the public way to the entrance, the counter and the restrooms, and accessible fixtures and clearances. This is often the largest hidden scope in an older building.

Parking and Planning

Restaurants are typically assigned a higher parking requirement than retail. Depending on the zone and the city, the change may need Planning clearance or a different approval before Building will accept the permit application.

Mechanical, plumbing and the kitchen

Cooking brings a hood and exhaust, make-up air, a grease interceptor and more plumbing than a shop ever had. These are engineered items and they need room, which is why an architect looks for them during feasibility.

The process

  1. Feasibility: confirm the zoning allows the use, identify the occupancy change and list what it triggers.
  2. Design: plan the space to satisfy the new requirements while serving the business.
  3. Construction documents: a coordinated set covering architecture, accessibility, mechanical, plumbing and the kitchen.
  4. Submittal: Building plan check, the Health Department for food service, and Planning where required.
  5. Corrections: the reviewer’s questions, answered by the architect until approval.
  6. Permit, construction and inspections.

A worked example

On Beverly Boulevard, an existing retail tenant space inside a building designed by Neil Denari became an Alfred Coffee. The project was a change of use and a full tenant improvement: accessibility upgrades, space planning, a coordinated kitchen layout and approvals from both Building and the Health Department, while keeping the building’s original character intact. Read the case study.

Planning a project like this? A first consultation covers feasibility, the approvals your space will trigger and a realistic timeline. Schedule a consultation or call (805) 280‑9177.
Sheida Moradi

About the author

Sheida Moradi

Principal architect at Sheida Moradi Architects Inc. in Woodland Hills. PhD in Architecture from the University of Tokyo, NCARB certified and California licensed, with 30 years of practice across Iran, Japan and California, and a member of the Calabasas Architectural Review Panel since 2020.

About Sheida
Schedule a consultation

Tell us about the space. We'll tell you what it takes.

A first conversation covers feasibility, the approvals your project will trigger, and a realistic timeline. No obligation.

  1. 01We reply within one business day to set up a call or a site visit.
  2. 02The consultation covers goals, budget, timeline and the approvals your project will trigger.
  3. 03You receive a written scope and fee proposal.

Consultation request

This field is for validation purposes and should be left unchanged.
Name(Required)
Drop files here or
Accepted file types: jpg, jpeg, png, pdf, Max. file size: 10 MB, Max. files: 5.